Following our supplementary consultation held earlier this year, we have continued to work with our stakeholders and statutory consultees to develop our design. This has resulted in a number of design refinements, which we are now consulting on.
Your views will help shape our proposals, ahead of us submitting our DCO application to the Planning Inspectorate later this year.
We want to get all aspects of the design, construction and operation of the Lower Thames Crossing right. Our approach to the project’s design has also been guided by highways standards and good industry practice, which seek to ensure the Lower Thames Crossing is safe to construct and operate, is sustainable and will create a positive legacy for future generations.
NOTE: Throughout this section, we refer to the Lower Thames Crossing as ‘LTC’. Any distances provided are approximate and subject to change. The images used are illustrative for this consultation and may change as a result of our ongoing assessments and the feedback we receive. The pictures of our design refinement consultation proposals illustrate how locations might look 15 years after the opening of the LTC.
The information we are presenting during this design refinement consultation focuses on changes to the project since our supplementary consultation, carried out earlier this year. The main refinements are summarised below and set out in more detail in this section.
1. M2/A2 junction:
2. Southern tunnel entrance:
After further investigation and consideration of the feedback from supplementary consultation, we have developed our landscaping proposals around the electricity substation at the southern tunnel entrance to help ntegrate the infrastructure into the existing landscape.
3. Northern tunnel entrance:
4. Route near Tilbury:
Two footpaths in the area would be slightly realigned and the option of a shared path along the south of Muckingford Road would be progressed. This would allow for better connectivity between Chadwell St. Mary and East Tilbury.
5. A13/A1089 junction:
Did you know?
If woodland is lost or damaged, woodland compensation proposals might include the creation of new woodland, or the restoration of an existing one.
6. In the vicinity of the Mardyke:
Some utility works in the vicinity of the Mardyke would be required to create an access off Green Lane for future National Grid maintenance works.
7. LTC/M25 junction:
Did you know?
Multi-utility diversions include local electricity, gas and water pipes, sewers, and fibre-optic and communications cables.
8. M25 junction 29:
We have continued to refine our proposals for utility diversions across the LTC route and are now proposing some further changes to the position presented at supplementary consultation. This information is provided in this chapter. In some cases, these changes result in a refinement to utility works and land required, particularly around the A2 area. In others, however, we now know that some additional land, from what was shown at supplementary consultation, would be required.
Also, since our utilities proposals were first presented at statutory consultation, we have continued to review the extent to which these would qualify as Nationally Significant Infrastructure Projects (NSIPs) as the design has developed. Currently, it is considered possible that a small number of diversions may qualify as NSIPs. If so, these utility diversions would still be consented as part of the Lower Thames Crossing DCO, as with the other diversions. We would confirm the position as part of our DCO application and ensure that the relevant energy National Policy Statements are considered.
A number of small permanent electricity substations, approximately three metres wide by three metres long and 2.5 metres in height, would be installed across the route. These would be located within a total area of approximately five metres by four metres to allow for maintenance of the substations.
The provision of access for maintenance would also be required in some cases. The substations, and any access, would be located within the development boundary shown at this consultation.
Installation would be carried out as part of the wider utility works proposed for the area. The exact number and location of these substations, as described in this guide, are indicative only and are not shown in the maps in this document. The precise number and locations would be confirmed following further design work and continued engagement with our stakeholders.
We would look to minimise any impacts on residential and commercial properties, such as visual impacts, when developing the detailed design.
Did you know?
A technology asset is a piece of electronic equipment that provides motorists with road traffic information, e.g. signals for lane control and variable speed limits.
Also included in this chapter is information regarding our landscaping proposals. As we have progressed the design of the LTC, we have also developed more detailed landscaping proposals to mitigate the visual impacts of the project’s above-ground infrastructure. Since supplementary consultation, we have added more detail on the specific type of ecological mitigation proposed across the route, such as grassland, woodland and further detail around watercourses.
We have also developed our proposals for integrating drainage ponds into the landscape and for making the area of land around these assets easier to manage for landowners and for any maintenance work. For example, at a number of locations along the route, we have extended the land required around the drainage ponds to include existing boundaries such as hedgerows. Similarly, we also propose alterations to the shape of some areas of land for planting to make the boundary edges easier to maintain.
We propose a number of maintenance access tracks along the LTC route and more information is available throughout this chapter. Some of these feature a parking bay for maintenance vehicles. These tracks would provide access to ponds, fields, culverts, pylons and technology assets. They are not for public use or ‘rat-running’ and would be secured with an access control system. They would only be used for the purposes of operating and maintaining the LTC and associated infrastructure. This would include maintenance access to infrastructure owned by the utility companies. In some instances, we have combined the access tracks with routes for walkers, cyclists and horse riders.
Following the Preliminary Environmental Information Report published at statutory consultation, where the need for noise mitigation was identified, detailed noise assessments have been carried out. These assessments have identified locations along the route where noise barriers could be used to reduce road traffic noise. As a result, we are now proposing to install 17 noise barriers at specific locations along the route.
For further details on the indicative location and sizes of the noise barriers, please refer to the maps presented throughout this guide.
Environmental impacts
For more information on the environmental impacts of our design refinements, please see our Environmental Impacts Update document.
Have your say
If you would like to comment on areas of the project that are not covered by a specific question on our design refinement consultation response form, please use question 4: ‘Other comments’.
For the purpose of describing the changes in more detail, we have divided the route into two sections:
First, we will describe our proposals south of the river, then work our way north of the river.
Continue to the next section: Section 3a: Design refinements - South of the river in Kent